MAMUT Systems

Pricing

Three ways to price the work. No rate card.

Every quote is priced against your drawings. It states which pricing model applies, what is included, and how many review cycles are in it, so the number holds up when the work starts.

Rebar

Per sheet, or per ton

Per sheet fits foundations, miscellaneous concrete, and small revisions. Per ton fits a building cage where the sheet count is a poor proxy for the bars. After we see the drawings we say which one we are using, and why.

Structural steel

Per ton

Shop and erection drawings are quoted per ton of steel detailed. Miscellaneous metals and a handful of connections are quoted per sheet when tonnage would distort the price. DSTV output is included only when the quote says so.

BIM and Civil 3D

Hourly

Revit modeling, clash coordination, and Civil 3D drafting are hourly. The quote states a cap before work starts, the LOD or the sheet list, and what happens if the design set changes underneath the model.

What changes the number

  • How complete the design drawings are, and how many RFIs we expect to write before detailing.
  • The standard and the software. A Revit cage and a DWG placing set are not the same hours.
  • How many review cycles are included. The quote states the number. Further cycles are quoted again.
  • Whether an NDA, a specific template, or a fabricator standard has to be adopted first.

Next step

Request a quote against your drawings.

Send the set. The quote comes back with scope, schedule, and review cycles spelled out.